If you are still confused about whether to install tile shower floor or walls first for your do it yourself project the good news is that you do not necessarily need to fully tile the floor or the wall first.
Do i tile the floor first or the walls.
Begin the installation project by starting with the second row of wall tile.
Whats people lookup in this blog.
The painter though insisted that the tiling be done first.
However professional tilers will disagree with this.
If you tile the floor first you may accidentally damage the new floor by dropping things on it.
If the floor happens to be raw wood paint can seep into the wood and stain it almost beyond repair.
The reason for that is that this can damage the floors.
From there you should rip up the floors.
Walls first floors last if anything its because walls tend to have white or lighter grouts than floors so if you do the floor first and grout with grey when you do the walls you will inevitably drop grout onto your lovely floor and cause light patches to your grout also you might drop a tile onto your floor and chip something get your walls out of the way all shining and clean and then do.
Instead you can use a hybrid method.
At least not without some careful planning first.
The code states that wall tiles must overlap floor tiles also tiled hobs should a top tile that overlaps both vertical tiles on each side.
Also it s often better to paint the ceilings first especially given that the ladders will rest on the floors.
You would have to sand deeply into that raw wood to remove the paint pigment.
This may result in cracked tile.
When we did our bathroom the tiler wanted the painting done first because he was a perfectionist and wanted to make sure no paint would get on the grout where the walls and tiles met.
Do you tile the floor or walls first in a bathroom quora 7 tiling tips for professional looking results how to tile a bathroom floor with wickes you how to tile a bathroom wall with wickes you.
So even if you choose to paint the walls first it s best to protect your flooring from paint drips.
The wall tiles should overlap the floor.
The ideal is to first do any prep work to the walls e g ripping up wall paper sanding and patching walls etc.